New Build Development Scaffolding in Roedean

New build scaffolding in Roedean

Client:

CBG Construction 

Location:

Brighton, Roedean

Scaffolding Requirements:

The latest project we have been working on is a new build development consisting of a single residential large new build home located in Brighton. The work consists of working alongside other contractors on a fairly small site, meaning we had to work very closely with the site team to ensure our work is compact and keeps everyone safe. CNM worked alongside the brickwork contractor, providing them with brickwork lifts as well as a raised loading bay and staircase for access and fall protection. This is a current and ongoing project. 

Residential Scaffolding in Roedean
New build scaffolding West Sussex
Residential Scaffolding Roedean
New build scaffolding Roedean

The Old Dairy, Littlehampton

Diary Farm Littlehampton

Main Contractor:

PH Beck

Project Duration:

8 weeks per block

Project Type:

Erection of temporary scaffold structure for roofing works

Project Details:

CNM Scaffolding recently undertook a significant project, demonstrating our prowess in the industry. The journey began with a competitive tender process in which we submitted a comprehensive proposal to the client. Our dedication to excellence, cost-effective solutions, and unmatched expertise set us apart, ultimately securing the project. Upon winning the contract, CNM Scaffolding immediately embarked on the design phase. Our team meticulously crafted scaffold designs that met the unique needs of the project. These designs were not only functional but also optimised for cost-efficiency. Concurrently, we developed precise programme timelines that ensured a streamlined workflow throughout the project’s duration. The culmination of our efforts was the successful implementation of the project. Our dedicated team worked tirelessly over a 15-day period to erect the first phase of the scaffold structure. Our commitment to precision, safety, and efficiency ensured that the project was executed with excellence, meeting and exceeding the client’s expectations.

Project Challenges:

The project required the erection of a temporary scaffold structure to support roofing works. The primary challenge was to ensure the scaffold met all safety and regulatory requirements while facilitating efficient roofing work. With the secondary block scheduled for erection in the next few months This continuity of workflow was crucial to meet the project’s deadlines and was meticulously planned. The challenge our teams also faced was working in a live environment, meaning that we had to ensure our team made allowances to work with the local residents to ensure that access was clear, and we were working within the working hours guidelines.

Key Highlights :

1. Client Satisfaction: CNM Scaffolding prioritised client satisfaction. Close collaboration with the client, PH Beck, ensured that the
project’s objectives were met, and the client was very pleased with the results.

2. Community Engagement: CNM Scaffolding worked closely with local residents to ensure their needs and concerns were addressed throughout the project. Open communication and community outreach played a vital role in maintaining a positive relationship with the residents.

3. Compliance with Legislation: CNM Scaffolding is committed to ensuring that all relevant scaffold legislation was adhered to. This included safety regulations, environmental standards, and other legal requirements.

4. Scaffold Design: CNM Scaffolding provided a scaffold design that met the project’s specific needs, ensuring both safety and functionality. The scaffold was designed to accommodate roofing works and provide a secure working platform for the roofing team.

Conclusion:

The commitment to client satisfaction, community engagement, compliance with scaffold legislation, and the provision of a well-designed scaffold structure were the cornerstones of this project’s success. CNM Scaffolding looks forward to future projects and the opportunity to continue delivering high-quality scaffold solutions.

West Sussex County Hall

West Sussex County Hall

Service type: 

Scaffold erected to allow for window and dormer repairs

Address: 

West Sussex County Hall

Summary of works:

Storm Eunice had severely damaged the flat roof of the hotel. The flat roof felt had been completely ripped from the boards causing interior flooding. Scaffolding was erected to allow for safe access to the roof. We had to section areas off as we worked for the health and safety of the general public.
Storm Eunice had severely damaged the flat roof of the hotel. The flat roof felt had been completely ripped from the boards causing interior flooding. Scaffolding was erected to allow for safe access to the roof. We had to section areas off as we worked for the health and safety of the general public.

As the business was still operating where it could, we had to adhere to the customer’s timings and requirements, to prevent them for losing further revenue. A suitable design for the entire building to encapsulate the building, with the rear scaffold being specifically designed to keep weight off the roof, as part of the building was still in operation. 

The project lasted for 6  months. 

cnmscaffolding West-Sussex-county-Hall
cnmscaffolding West Sussex County Hall

Avisford Park Hotel, Walberton

Avisford Park Hotel, Walberton

Service type

Scaffold erected to give safe access for roof repairs caused by Storm Eunice

Address

Avisford Park Hotel, Walberton
Storm Eunice had severally damaged the flat roof of the hotel. The flat roof felt had been completely ripped from the boards causing interior flooding. Scaffolding was erected to allow for safe access to the roof.

Summary of works

Our customer required scaffolding to be erected to the front elevation of the building so that repairs could be made to the windows and dormers safely. We had to consider continuous pedestrian and vehicle traffic. As well as this we had to section off areas with herris fencing. Our arrival and departure was prompt to prevent delays to office workers.

As the business was still operating where it could, we had to adhere to the customer’s timings and requirements, to prevent them for losing further revenue. A suitable design for the entire building to encapsulate the building, with the rear scaffold being specifically designed to keep weight off the roof, as part of the building was still in operation.

The project lasted for 6  months.

Points to consider

Section areas off as we worked for the health and safety of the general public.